06AUG10

Acousonde parameters:
Fs=9885 Hz, Cutoff Freq = 3097 Hz
Gain=20dB, Aux = 1 Hz
SN: A011 depth = 25m above bottom
SN: A020 depth = 6m above bottom

16:24:05  	Acousonde mooring deployed, depth 42.7m
		36  38.013' N
		121 52.013' W

16:28:22	EMATT deployed, depth 42.7m
		36  37.948' N
		121 51.957' W

16:45:22	Sediment Grab #3, depth 63.5m
		36  38.563'N
		121 52.838'W

17:04		Sediment Grab #4, depth=74.8m
		36  39.145'N
		121 53.647'W

17:26		Sediment Grab #5, depth = 49.2m
		36  40.502'N
		121 50.832'W

17:44		Sediment Grab #6, depth = 46.8m
		36  39.239'N
		121 51.393'W

17:52		12kt speed run started
18:00		speed run finished

18:04		CTD cast to 40m (water depth 44.5m)
		36  37.962'N
		121 52.026'W

18:21		10 kt speed run started
18:27		speed run finished, passed mooring

18:45 		Moored at pier for crew swap
19:01		Underway for leg 2

19:42		CTD cast to 80m (water depth 85.3m)
		36  39.808'N
		121 54.588'W

20:00		CTD cast to 65m (water depth 70m)
		36  38.837'N
		121 53.228'W

20:30		NOTE: Winds considerably stronger than this morning (~10kts)

20:40		CTD Cast to 35m (water depth 42.4m)
		36  37.980'N
		121 51.947'W

21:16		Sediment Grab #7, depth = 41.9m
		36  37.936'N
		121 51.947'W

21:28		Begin mooring recovery
21:33		mooring fully recovered

21:48		Ship pierside, offloading begins